- cleaned up remaining insulation
- tore out some scaffolding in the upstairs
- visited the landfill
- built a staircase
- built a set of stairs off the front porch
- put up a few 2 x 12's as ceiling joists for upstairs
- took down the antenna, put up an interior brace to secure the roof, and picked up around the house to prepare for bad weather
- cleared and cleaned up bits of wood, scaffolding, old wiring in old attic
- put in more 2 x 12's
- put in sheets of plywood 3/4 of the way across the front part of the floor upstairs which will serve as a balcony
- build and installed 4 - 9 ft wall frames to serve as front wall upstairs
- built and installed remaining 9 ft wall frames to finish framing wall upstairs
- installed back door and put in knobs and deadbolts on front and back door
- framed up 3 bedroom doors, closet door and bathroom door
- put in 24 collar braces above the 9 ft wall section upstairs which will serve as a support for the roof and floor joists for the attic
- began installing tongue and groove boards around the staircase to create a storage closet
Many thanks to all who have helped with the above work....Todd M., my brother Chris, our nephew Nate, Stafford, and our children.
Even with all the work we still managed to celebrate Christmas at church with a program and candle lighting ceremony, Christmas Eve with my brother and family, Christmas Day with family at Grandma's, spend time as a family, and enjoy the beauty of our place.